  1. 2022

    • September 2022

      SHE Award recently in September 2022.

    • March 2022

      We have won two Cross Island Line Qualified Person (Supervision) services on Contract CR103 and CR113 at about S$21 million in March 2022. CR103 is design and construction of Aviation Station and tunnel. CR113 is design and construction of Serangoon North Station and tunnel. The Cross Island Line is the Singapore 8th MRT line and the Singapore longest fully underground MRT line with over 50 km from Changi to Tuas.

    • August 2022

      GeoAlliance Consultants Pte Ltd has been granted by BCA to be a Public Sector Panels of Consultants (PSPC) – Panel CS03 which enables us to bid for public tenders up to 16 million project values in August 2022.

    • July 2022

      LTA awarded us all three (3) construction supervision contracts of Cross Island Line (CRL) Package 3: QP(Supervision) for CR109, CR111 and CR117 at about S$50 million in July 2022.

    • March 2022

      LTA awarded GeoAlliance Consultants Pte Ltd two (2) construction supervision contracts of the Cross Island Line (CRL): QP(Supervision) for CR103 and CR113 at about S$21 million in March 2022.

  2. 2021

    • December 2021

      LTA awarded the Qualified Person (Supervision) Services Contracts J111 and J112 in December 2021 to GeoAlliance as part of the consortium (Sterling C&S Consulting Engineer – Brown Consulting – GeoAlliance Consultants), for the supervision of Contract J111, comprising 1.5 km of viaduct between Enterprise Station (JS9) and Tukang Station (JS10), and Contract J112 that includes the Jurong Hill Station (JS11) and Jurong Pier Station (JS12) with 1.1 km of connecting viaduct along Jurong Pier Road. The Jurong Region Line is Singapore 7th MRT line and elevated MRT station line to serve western region of Singapore.

    • November 2021

      Singapore PowerGas has appointed GeoAlliance as the consultant to provide project management service, cost estimation, tender evaluation and supervision on Development of Gas Distribution Pipeline in November 2021. Singapore PowerGas Gas Mains Renewal Planning and Construction of Gas Distribution Pipelines, Singapore

    • December 2021

      LTA awarded Sterling-Brown-GeoAlliance Consortium construction supervision on Jurong Region Line (JRL) J111 and J112 viaduct MRT stations at S$21 million in December 2021

    • November 2021

      Term Contract for Consultancy Services for Gas Mains Renewal Planning and Construction of Gas Pipelines in November 2021

  3. 2020

    • GeoAlliance has received the award at the LTA Annual SHE Award Convention (ASAC) 2020 for Qualified Person (Supervision) for Contracts C882 and C883

    • Ministry of Defence Singapore awarded GeoAlliance Consultants Pte Ltd Accredited Checker Services for Developments in Gombak (Site B) in 2020

  4. 2019

    • April 2019

      BCA awarded ACO Services for The Design and Build (D&B) for The Phase 2 Intensification Works in BCA Academy at 200 Braddell Road in April 2019

  5. 2018

    • December 2018

      GeoAlliance has won the tender (about S$446 million) for Design and Construction of North-South Corridor Tunnel N108 together with China Railway First Group Co Ltd (CRFG), Singapore Branch in December 2018. The NSC is Singapore First Integrated Transport Corridor Featuring Dedicated Bus and Cycling Route. N108 Contract involves about 1.1 km of three dual-lane road tunnels between Marymount Lane and Pemimpin Place. We have created a record by breaking through into large D&C projects within less than 10 years of local establishment.

    • Staff Year End Gathering in 2018 (Christmas and New Year)

    • May 2018

      GeoAlliance has partnered the Building and Construction Authority (BCA) in offering a suite of BCA-Industry Built Environment Scholarship/Sponsorship Programmes to attract talents to join the construction industry in May 2018.

    • December 2018

      GeoAlliance has been appointed as the Design Consultant by China Railway First Group Co Ltd after winning North-South Corridor Tunnel N108, which consists of 1.1 km of three dual-lane road tunnels along Marymount Road, in December 2018.

    • September 2018

      LTA appointed GeoAlliance as its Accredited Checker and Specialist Accredited Checker for North-South Corridor Tunnel C103 in September 2018.

    • July 2018

      Consultancy Contract for the Development of Gas Transmission Pipelines and Associated Facilities (“Project”) in July 2018.

    • April 2018

      GeoAlliance has been appointed as AC(Geo) for the Singapore Mega Port Finger 3 Phase 2 at Tuas in April 2018.

    • January 2018

      SP Group has appointed us as the Consultant for Feasibility Study, Front-End Engineering Design (“FEED”) and Project Management for a new Gas Transmission Pipeline from Meranti View to Sakra in January 2018.

  6. 2017

    • Staff Year End Gathering in 2017 (Christmas and New Year)

    • GeoAlliance Consultants Pte Ltd is proud of receiving The Enterprise 50 (E50) Award in 2017 which recognises our contribution to economic development in Singapore and overseas.

    • October 2017

      LTA awarded us another over S$20 million contract in October 2017. GeoAlliance has been picked up by quality among 16 tenderers to provide supervision for Circle Line 6 (CCL 6) Keppel and Cantonment stations and associated bored tunnels. This is another authority’s endorsement on our excellent service delivered to the public projects. (Credit: LTA)

    • Q4 2017

      Underground Linkway connecting Tai Seng Industrial Estate and operational CCL Tai Seng station has opened in Q4 2017. It was underneath a 13 m wide existing open canal and constructed using a mining method with pipe roofing and steel frame support. We provided geotechnical design support and construction supervision for the underpass.

    • September 2017

      Thomson-East Coast Line T211 has successfully completed 3.9 km of bored tunnel using 4 slurry TBMs on schedule in September 2017. GeoAlliance is proud to provide construction supervision on the challenging tunnelling works in mixed face and directly under buildings for over 2 years.

    • We have completed the design and construction of ERSS for MediaPolis DOJO with soil nail and temporary removable ground anchor system in 2017

    • March 2017

      We completed the QP(Supervision) works for Thomson-East Coast Line T215 Mount Pleasant Station Bored Tunnel (South Bound) Works from Old Police Academy to Caldecott Station at Toa Payoh Rise in March 2017

    • October 2017

      LTA awarded GeoAlliance QP Supervision Service for Circle Line 6 (CCL 6) Contracts C882 and C883 at S$23 million in October 2017.

    • June 2017

      GeoAlliance was appointed as Consultant for PUB Design and Build for Chlorine Tank and Sewer Diversion at Bedok Waterworks in June 2017.

    • March 2017

      PUB appointed GeoAlliance as independent geotechnical expert for NEWater Tunnel Project in March 2017.

    • February 2017

      MOE awarded us checking services for Raffles Girl School (Secondary) at Braddell Road in February 2017.

    • Overseas · Australia

      We were involved in geotechnical analysis and design for Sydney Light Rail Moore Park Stop, NSW, Australia in 2017.

  7. 2016

    • Staff Year End Gathering in 2016 (Christmas and New Year)

    • October 2016

      Our new address is at 33 Ubi Ave 3 #05-11 Vertex Tower B Singapore 408868 with effect from 21 October 2016.

    • September 2016

      We have been approved for bizSAFE Level 3 by WSH Council in September 2016.

    • We are very proud to announce that we have been awarded Singapore SME 1000 Best Performance Company in 2016.

    • December 2016

      GeoAlliance was appointed as Consultant on Basement Excavation Design for Mediapolis 8 in December 2016.

    • November 2016

      LTA awarded us AC for New Road Link in between Senja Road and Kranji Expressway in November 2016.

    • October 2016

      GeoAlliance has been awarded AC(Geo) for Mandai Park Development in October 2016.

    • July 2016

      JTC awarded us AC and AC(Geo) for JTC Furniture Hub at Sungei Kadut in July 2016.

    • Overseas · Australia

      We completed geotechnical analysis of Northern Wall: 354-368 Old Northern Road, Castle Hill, NSW, Australia in 2016.

    • Overseas · Australia

      We were involved in retaining wall design for the Sydney Water Land Stage 1 and 2 at NWRL (North West Railway Link), Skytrain, NSW, Australia in 2016.

    • Overseas · Malaysia

      GeoAlliance was awarded as PE(Geo) for assessment of reclamation works on submarine pipes in Johor for a period of 24 months in 2016.

  8. 2015

    • October 2015

      We have achieved ISO 9001:2008 Accredited Certification – Quality Management System in October 2015.

    • October 2015

      We have achieved ISO 14001 Standard – Environmental Management System in October 2015.

    • Staff Team works in East Coast Park in 2015.

    • December 2015

      We have sponsored NUS Geotechnical Night which will organise an event in December 2015.

    • Staff Year End Gathering in 2015 (Christmas and New Year)

    • Since 2012

      We have successfully and safely completed 3-year consulting Service for QP Supervision of LTA Contract ER405 – Widening of Upper Paya Lebar Road from Upper Serangoon Road to Bartley Road since 2012.

    • We completed on schedule for Design and build project for the pedestrian on Gateway Road in 2015. We provided design and construction supervision for 45 m span precast RC pedestrian bridge connecting IMM shopping centre to hospital and Jurong East MRT station

    • Overseas · Malaysia

      We have completed for PUB professional engineering design services for enhancement to the structural stability of Johor pipelines at JR118 Plentong, Johor, Malaysia in 2015.

    • October 2015

      PUB awarded us professional engineering service for checking geotechnical analysis in October 2015.

    • September 2015

      HDB awarded us specialist accredited checking services for building works at Bidadari Contract 1, Contract 2 & Contract 3 and Common Green in September 2015.

    • Overseas · IndonesiaDecember 2015

      We were appointed as geotechnical sub-consultant for PLTM Tongar 6MW hydropower plant in West Sumatra, Indonesia, in December 2015.

    • Overseas · Malaysia

      GeoAlliance completed a full geotechnical consultancy service including design and supervision on enhancement works of PUB water pipeline in 2015 at Johor, Malaysia.

  9. 2014

    • LTA awarded us the consultancy contract of S$20.5 million for supervision of LTA Thomson Line Contracts T211 (Sin Ming) and T215 (Mount Pleasant) on construction of MRT stations and tunnels in 2014.

  10. 2012

    • LTA awarded us construction supervision of advance earthworks at Mandai Depot of Thomson Line in 2012.

    • NParks awarded us preliminary studies and visual inspections for slopes in Labrador Park Nature Reserve in 2012.

  11. No date stated in the source

    • We have completed the major part of the mining works for C9058 QP(Supervision) work for Bukit Panjang Underpass to connect Bukit Panjang MRT station to HDB estate and shopping mall

    • Overseas · Vietnam

      GeoAlliance carries out technical due diligence on geotechnical aspects including dam foundation and landslide potential on up to 20 hydro plants in southern Vietnam for a Singaporean fund manager.

ACCREDITATION

Licences, certificates and recognition

Licensed

  • Professional Engineers Board Singapore

    Licence to supply professional engineering services

  • BCA Accredited Checking Organisation

    Accredited Checking Organisation (ACO) registered with the Building & Construction Authority

  • BCA Public Sector Panels of Consultants, Panel CS03

    Enables us to bid for public tenders up to 16 million project values

    Since August 2022

Certified

  • ISO 9001

    Quality Management System

    Since October 2015

  • ISO 14001

    Environmental Management System

    Since October 2015

  • ISO 45001

    Occupational Health and Safety Management System

  • bizSAFE Level 3

    Approved by the WSH Council

    Since September 2016

Recognised

  • LTA Annual Safety, Health and Environment Award 2020

    LTA Annual SHE Award Convention (ASAC) 2020, Qualified Person (Supervision) for Contracts C882 and C883

    Since 2020

  • Enterprise 50 Award 2017

    Recognises our contribution to economic development in Singapore and overseas

    Since 2017

  • Singapore SME 1000, 2016

    Singapore SME 1000 Best Performance Company

    Since 2016

RESURFACE

Tell us about your project.

Send us the scope and stage. A Professional Engineer will reply.

Download our capability statement (PDF, 3 MB, 2018) Chinese edition (PDF)