Enquire

SERVICES · 02

Analysis & Design

SCOPE

What this covers

  1. Geotechnical interpretative studies
  2. Geotechnical instrumentation
  3. Earth retaining structures (ERSS or TERS) and basements
  4. Numerical modelling (Plaxis 2D and 3D, ETABS, SAFE, Staad Pro, Prokon)
  5. Foundations for buildings and bridges
  6. Coastal and offshore foundations
  7. Coastal and port development
  8. Underpinning and strengthening of existing structures
  9. Damage assessment to buildings
  10. Slope stability and stabilisation
  11. Ground improvement
  12. Cut-and-cover, bored and mined tunnels
  13. Pipe-jacking and shafts
  14. Cofferdams
  15. Industrial and residential buildings
  16. QECP services

CREDENTIALS

Qualified to act in this role

  • DesignPE(Civil) · PE(Geo) · QP(Design)
  • LicenceProfessional Engineers Board Singapore · Licence to supply professional engineering services

RELATED PROJECTS

Where we have done this

  • North-South Corridor Tunnel N108

    Client China Railway First Group Co Ltd (Singapore Branch)

    Service Design consultant

    Date December 2018

    Value About S$446 million, design-and-build contract

    About 1.1 km of three dual-lane road tunnels along Marymount Road, between Marymount Lane and Pemimpin Place. The North-South Corridor is Singapore's first integrated transport corridor featuring a dedicated bus and cycling route.

  • Development of Gas Transmission Pipelines and Associated Facilities

    Client Singapore PowerGas

    Service Consultancy Contract

    Date 2021

  • Queenstown Contract 1

    Client Housing & Development Board

    Service Specialist Professional Engineering (Geotechnical) Consultancy Services

    Date 2021

  • Gas Mains Renewal Planning and Construction of Gas Pipelines

    Client Singapore PowerGas

    Service Consultancy Services

    Date 2018

  • Murnane Pipeline

    Client Black & Veatch (SEA)

    Service Geotechnical consultancy

    Date Feasibility March 2013, detailed design in progress

    A PUB water pipeline from Murnane Service Reservoir to Marina South, crossing below several MRT tunnels, roads and buildings: construction method, alignment study and cost estimate.

  • P&G Innovation Centre

    Client Gammon Construction

    Service Qualified Person (Design), ERSS

    Date June 2012

    A six-storey research and development centre with two basements at Biopolis; ERSS support system and construction decking.

All projects

RESURFACE

Tell us about your project.

Send us the scope and stage. A Professional Engineer will reply.

Download our capability statement (PDF, 3 MB, 2018) Chinese edition (PDF)