Construction of Sengkang West Drive (Part 1) (at-grade road from TPE to Fernvale Street)
Client Housing & Development Board
Service Specialist Accredited Checking Services
Date 2021
ABOUT THE PROJECT
About 1.1 km of three dual-lane road tunnels along Marymount Road, between Marymount Lane and Pemimpin Place. The North-South Corridor is Singapore's first integrated transport corridor featuring a dedicated bus and cycling route.
MILESTONES
December 2018
GeoAlliance has won the tender (about S$446 million) for Design and Construction of North-South Corridor Tunnel N108 together with China Railway First Group Co Ltd (CRFG), Singapore Branch in December 2018. The NSC is Singapore First Integrated Transport Corridor Featuring Dedicated Bus and Cycling Route. N108 Contract involves about 1.1 km of three dual-lane road tunnels between Marymount Lane and Pemimpin Place. We have created a record by breaking through into large D&C projects within less than 10 years of local establishment.
December 2018
GeoAlliance has been appointed as the Design Consultant by China Railway First Group Co Ltd after winning North-South Corridor Tunnel N108, which consists of 1.1 km of three dual-lane road tunnels along Marymount Road, in December 2018.
SAME SECTOR
Client Housing & Development Board
Service Specialist Accredited Checking Services
Date 2021
Client JTC
Service Accredited Checking Services
Date 15 August 2019
Client Land Transport Authority
Service Qualified Person (Supervision)
Date End 2015
Client Land Transport Authority
Service Specialist Accredited Checker (Geotechnical)
Date May 2012